Batteries

Performance and Endurance Tests:
Acc. to batteries supplier specifications
Acc. to the user’s requirements, mission profiles Benchmarking
Process and test validation (including audits)
Temperature dependence
Problem Solving
Post Mortem and Construction Analyses, Reverse Engineering
|
Supports of Lead Acid Batteries Manufacturers Process control upgrading SPC deployment Process audit Training session Construction analysis |
|
Batteries Management System (BMS)

Development of control algorithms (soft)
Benchmark of electronic components (hardware)
Qualification
Thermal Management,
Safety,
SOC Indicators,
Balancing
Problem Solving and Corrective Actions
Batteries Tests Capabilities & Equipments
Test equipment for electrical characterization:
---- Ranging from small size button/coin cells
-----to fully integrated battery pack for the automotive industry (250 kW)
---- Frequency Response Analyzer (FRA) for cell impedance evaluation
Climate chambers (-20 - + 60 °C) and ovens, thermal baths
Glove box under dry air and inert atmosphere for construction analyses
Case 1 : X1-Y1 batteries in non conformity when received by the customer
Electrical :
- Charge/ Discharge tests and capacitance measurement
- Charge C10 during 16h and discharge 5C during 5h (stop at 1V)
- Stabilisation
- Capacitance measurement
- Test duration: 10 days
- Cycles during 8 days at different charge/discharge conditions (C/40 to C/2)
- Optional : Impedence spectroscopy : internal R measurement, from a few mHz to 65KHz.
Physical : Battery Opening and sample extraction
- Visual and optical Inspections
- Sample preparation for access to the active material (electrolyte removal, drying in oven)
- Embedding and polishing
- SEM/EDX observation
- Optional : X-Ray Diffraction for grain size of negative material
Case 2 : X2-Y2 Batteries , not in correspondance with the expected performances (field return).
Phase 1 - Engineering
- Use condition study : determination of a representative functional user profile (for further ageing tests)
Phase 2 - Performance Tests
- Charge and Discharge cycles at 3 oven temperatures (25°C, 0°C, -10°C)
- Different discharge conditions (1C, 0.5C, 0.2C)
Phase 3 - Endurance Tests
- Tests following performance tests according to the profile as defined phase1
Phase 4 - BMS characterization
- Battery opening
- For each cell : Voltage measurement
Capacitance measurement according to 0.5C discharge
Case 3 : X3-Y3 Batteries, Comparative tests
|
Phase 1 - Performance Tests Phase 3 - Stratification
|
|
Equipment list for batteries



Further informations !
CALL US : +33 (0)557 26 08 88
Business : Sylvain DULPHY, Sales Engineer (+33 (0)677 10 37 40
Technical : Pascal GOUEREC, Energy Technical Leader
To leave a message, click here








